In the case of:
We can close the job and get paid for it.
To do this:
On the miter, we make the following metrics:
HIP >> TDR, TAP (PASS), GROUND BLOCK (FAIL), CPE (PASS).
(The easiest way to get a FAIL result is simply to unplug the wire.)
Next we do HHC (Pass to Close)
It is desirable to go all green, if not, we do the following actions:
Click on Proceed >> Exception >> Refer Drop Bury...
Further, when closing the job to the question "Is there Underground...Needed" Answering "YES" A form will pop up, fill it out.
Make sure the code "Refer To Drop Bury" is selected.
And close the job.
In all other cases:
We call the DOJ and say:
"Needs Driveway bore" if you need to dig under concrete 6ft>60ft wide.
"Needs Prebury" - If there is no concrete or it is already 6ft.
You'll be out of a job.
Don't forget to report to the NOT DONE group, attaching all the necessary photos plus a photo showing which side of the house the meter is on. Example photo.